Key figures

Employees
0
M€ of turnover
0
18 years of collaboration with Sanofi, Total and Air Liquide.
0

Who we are

Laurent Apetogbor

A local presence in the image of the Capital, dynamic and heterogeneous since its creation.  Ekium has been referenced under a framework contract for many years with the main industrial groups EDF, Total, Arkema, Sanofi, Air Liquide, CEA, GRTgaz, etc. We are continuing our development with our new partnerships with Engie, Storengy, Seqens, CPCU, RATP, RTE for engineering, works supervision and industrial maintenance services. Our multidisciplinary teams, Technicians, Engineers, Project Managers, remain mobilized to respond to your consultations.

Laurent Apetogbor

Director

Projects

Creation of a production line for injectable products.

 

  • Increasing the production capacity of the site, while adapting to its location. 

    Ekium carries out the studies and the follow-up of works :

    • Surveying and taking into account existing elements (Civil Engineering)
    • Representation of steel structure
    • Representation of the block: partitions, load-bearing ceiling
    • Incorporation of supplier machines 
    • WFD piping study on Plant 3D :
    • Validation of supplier drawings
    • Supervision of works

Sanofi

Ile-de-France

Implementation of a turnkey Building Management System for comfort management in the office and shop areas.

Afin de satisfaire aux exigences d’Alteo et de répondre aux enjeux du projet, Ekium a mobilisé :

  • Une équipe en front office de 9 techniciens dont des experts en manutention continue, pour réaliser les études d’implantation, relevés, …
  • Des équipes en back office, spécialisées notamment en Charpente, Génie Civil, Tuyauterie, pour réaliser les notes de calculs (Mécanique, Charpente, Génie-Civil, Pompes) et les plans de certains ouvrages.

LVMH LA SAMARITAINE

Paris (75)

Renovation of the BMS (Building management system)  with replacement of the office comfort controllers in occupied environments and replacement of all the HVAC (heating, ventilation and air-conditioning) controllers.

Afin de satisfaire aux exigences d’Alteo et de répondre aux enjeux du projet, Ekium a mobilisé :

  • Une équipe en front office de 9 techniciens dont des experts en manutention continue, pour réaliser les études d’implantation, relevés, …
  • Des équipes en back office, spécialisées notamment en Charpente, Génie Civil, Tuyauterie, pour réaliser les notes de calculs (Mécanique, Charpente, Génie-Civil, Pompes) et les plans de certains ouvrages.

Siège Telmma

Suresnes (92)

Martigues en images

They trust us