Marseille Nucléaire
Key figures
Who we are
A local presence that allows EDF to rely on real specialists who have a very good knowledge of the Nuclear Park in operation.
Sylvain Saigne
agency manager
Projects
Carrying out studies relating to the induced effects of 900 MWe & 1300 MWe.
This project consist of the study of various attacks of the type : Explosion, Flood, Spray, fire, Whipping, load drop, Shock from other equipment and is based in particular on the deployment of the SQUG method (Seismic Qualification Utility Group).At the end this is 20 Nuclear Power Plants (CNPE) of the French nuclear fleet that has been inspected.
EDF / DIPDE
Change in the lightning reference system, now based on the INB decree of 7 February 2012.
EDF has entrusted Ekium with carrying out studies on lightning risk control to demonstrate the robustness of the installations against extreme lightning aggression (perimeter 10 CNPE bearings CP 0 CP 1 CP 2 and N 4 1300MWe). These studies will be used for the projects to bring the CNPEs into compliance that are currently being carried out and will eventually be integrated into the next ten-yearly VD 4 900 and VD 2 1450 visits.