Know-how
- Project management for the revamping or the project of a new unit
- Definition, choice of instrumentation
- Studies and project management of system migration
- Participation in risk studies (HAZOP, LOPA, ...)
- Ism'ATEX Certification (Training)
- SI loop calculation
- SIL loop calculation
- Execution studies
- Work follow-up
- Pre-acceptance operations, commissioning
- Keys in hand
Sectors
- Chemistry / Petrochemistry
- Energy & Environment
- Nuclear
- Oil & Gas
- Paper industry
- Life Sciences
- Glassware
Regulation
- NF EN 62305
- Directive ATEX 94/9/CE
- Directive Machines 2006/42/CE
- NF EN 61508
- NF EN 61511
Know-how
- Block diagram, PFD, PID/UID
- Instrumentation list
- Typical actuator control diagram
- Assembly diagram
- Layout of instruments, paths, cables...
- Terminal block diagram, Loop diagram
- SIL loop calculation
- List and synchronization sheets
- Functional analysis 1st level
- Specification of instruments, analyzers...
- Technical memorandum (APS, APD), study report, budget estimate, schedule...
- Special Technical Specifications for the consultation of the works
- Calculation notes, dimensioning (cables, SI barriers...)
- Assistance and Interfaces with the PROCESS, HVAC, IG batches